" loading="lazy" alt="" />

Execution of integrated fiber networks “FTTH”

Execution of integrated fiber networks “FTTH”

Planning, design, and integrated execution of integrated fiber network projects in new construction, extension and maintenance works on existing networks in operation.

1-Digging and throwing pipes.
2-Pulling cables.
3-Installing boxes.
4-Welding and testing.
5-Delivery.

Executing integrated fiber project works on the hands of an integrated, specialized team trained on manual and mechanical drilling using the best and most up-to-date specialized drilling equipment for fiber cables. This in addition to all civil works by constructing, installing, and supplying various cabins (concrete, metal, and specialized boxes).

Executing works of cable of various types by using modern air push technology, or by traditional pulling.